Skip to content

Push methods & rollouts ​

When you ship a release, two choices decide how it reaches your devices: the push method (does the device get a say?) and the delivery strategy (all at once, or in waves?).

Push methods ​

The push method controls whether a device installs an update automatically or only after someone approves it.

Push methodBehavior
mandatoryThe update is delivered and installed without asking. Use for fixes that must go out.
wait-for-acceptanceThe device is invited to accept the update first, and installs only after it agrees.
defaultFollows the device's own update policy.

Device approval ​

With wait-for-acceptance, each deployment action passes through a short approval handshake before installing:

  1. The device is invited to accept the update.
  2. The device's operator responds:
    • Accept → the update installs.
    • Skip → the device declines and the deployment ends as skipped.
    • Ask again → the decision is deferred and Fleet asks again later.
Device is invitedAccept — the update installsSkip — ends as skippedAsk again — decision deferredFleet asks again later

This lets operators choose a convenient moment to update — useful for devices that can't be interrupted at arbitrary times.

Delivery strategies ​

The strategy controls how many devices update at once.

Linear ​

A linear release targets all eligible devices together. It is the simplest option: play the release and every matching device starts updating.

Rollouts ​

A rollout delivers the release in waves instead of all at once, so you can limit blast radius and catch problems early. A rollout is made of ordered plans, and each plan describes one wave:

  • How many devices the wave covers (and, optionally, which ones, by label).
  • A time window for the wave to complete.
  • An error threshold — how many failures are tolerated before the rollout stops advancing.

Fleet works through the plans in order. If a wave exceeds its error threshold, the rollout halts so you can investigate before more devices are affected.

Wave 1first 10 devicesWave 2next 50 devicesWave 3remaining devices…errors underthresholderrors underthresholdthreshold exceededrollout halts

Choosing ​

  • Need it out everywhere, now? Mandatory + linear.
  • Shipping something risky to a large fleet? Rollout, so a bad release is caught in an early wave.
  • Updating devices that can't be interrupted on demand? Wait-for-acceptance, so operators pick the moment.